Frameless Glass Balustrade Carried Down an External Steel Staircase - Sheffield

Frameless glass balustrade in a base channel carried down the raked stringer of an external steel staircase, Sheffield

A walkout balcony and an external steel staircase in Sheffield, where the frameless glass does not stop at the top of the stairs. The same base channel that holds the glass along the balcony carries on down the flight, so the guarding reads as one continuous run from the deck to the ground. This is our Infinity frameless walk-out balcony with a matching steel staircase, surveyed, drawn, trial built in our Sheffield workshop and installed by us.

Frameless glass balustrade in a base channel carried down the raked stringer of an external steel staircase, Sheffield
The base channel turns at the head of the flight and rakes down with the stringer, so the glass never stops

Project overview

  • Client type: Residential
  • Location: Sheffield, South Yorkshire
  • Scope: Survey, design, manufacture, trial build and installation
  • Balcony: Post-supported walkout balcony with a frameless glass balustrade, 5680mm long x 1950mm deep
  • Balcony frame: 150 x 100 x 5 RHS main frame on 80 x 80 x 5 SHS support posts, 10mm and 12mm plates
  • Joists: 100 x 50 x 6 RSA steel joists at 370mm centres, doubled under the decking joint
  • Decking: 140 x 25 composite boards
  • Staircase: 12mm stringers, 6mm Durbar treads on 50 x 50 cleats, 80 x 80 x 5 SHS support post, 900mm wide over the stringers
  • The detail that makes it work: 80 x 80 steel balustrade support angles on the outside of the stringers, carrying the base channel down the rake
  • Balustrade: 120 x 72 powdercoated aluminium base channel, guarding 1110mm above deck
  • Glass, landing: 17.5mm toughened and laminated clear
  • Glass, stair: 15mm toughened clear
  • Privacy: Obscured panels in the same channel on the side facing the neighbouring garden
  • Handrail: Ø42 slotted stainless steel handrail to the stair sections
  • Finish: All metalwork hot dip galvanised and then powdercoated
  • Fabrication: BS EN 1090-2, execution class EXC2, declaration method 3b, S275

Get a price for something similar

This is our Infinity frameless walk-out balcony, set out to your own opening, with the staircase and its glass designed as part of the same job rather than added afterwards.

See prices and options

What was there before

A plain brick rear elevation with a UPVC porch, a first floor door with nothing behind it, and a yard that falls away across the width of the house.

The rear elevation before the walkout balcony and steel staircase were installed, Sheffield
The elevation at survey, with the porch and the rainwater downpipe that both had to stay

Two things on that elevation decided a lot of the design. The porch sits in the middle of the run and the balcony had to clear it. The rainwater downpipe was staying, so the frame was set out around existing pipework rather than the pipe being moved to suit the steel.

The falling ground matters as much. The four pads carrying the posts are not at one level. Each was set out individually on its own drawing, levelled off a datum taken under the door, because the yard drops as it runs away from the house. Pad positions and depths worked out on a drawing before anyone digs are a lot cheaper than four holes that turn out to be wrong.

Why base channel balustrades usually stop at the top of the stairs

Base channel is the neatest way to hold a frameless glass balustrade. The channel is fixed down along the whole run, the glass is set into it and clamped, and there are no posts and no clamps on show. On a flat run it is straightforward.

A staircase is a different problem. There is no flat surface to fix a channel to. The top of a stringer is a narrow edge, it is raked rather than level, and the channel needs a continuous, properly supported seat along its whole length or the glass has nothing to work against. That is why most jobs change system at the top of the flight. The balcony gets frameless glass, and the stairs get a posted balustrade, a bar infill or a railing instead. It works, but you can see the join, and the stair ends up looking like a different product bolted onto the balcony.

How the channel was carried down the flight

Here the drawing adds an 80 x 80 steel angle to the outside of each stringer, and that angle carries the base channel all the way down the rake. The glass sits in the channel on the stairs exactly as it does on the balcony, in the same 120 x 72 section, at the same offset from the structure, with the same frameless finish.

Close view of the base channel carried on an 80 x 80 steel angle fixed to the outside of the staircase stringer, Sheffield
The channel sits outboard of the stringer on the added angle, fixed at regular centres down the rake

Two things follow from doing it that way. The first is that the glass line sits outside the stringer rather than on top of it, so none of the 900mm stair width is lost to the balustrade. The second is that the angle has to be set out on the drawing, not worked out on site, because its position fixes the glass line, the glass sizes and the point where the raked run meets the horizontal run at the top. Every panel on the flight is a different shape, and they are cut from the drawing before anything is galvanised.

It was built once in our workshop before it was built on site

This is the part of the job nobody photographs and everybody should. Before any of it went to the galvanisers, the whole thing was assembled in our Sheffield workshop: posts, main frame, joists and the staircase hung off it, standing on the shop floor in raw steel.

The complete walkout balcony steel frame and staircase trial assembled in the Dio-Met workshop before galvanising, Sheffield
The whole balcony and staircase standing in the workshop in raw steel, before it was taken apart again

It is then taken apart, galvanised, powdercoated, and bolted back together on site. The site visit is assembly, not fabrication.

Steel balcony frame with the external staircase and Durbar treads trial built in the Dio-Met workshop, Sheffield
The flight hung off the frame in the workshop, Durbar treads on, before anything was coated

The reason it matters on this job in particular is the stair balustrade. The angles, the channel, the raked glass sizes and the junction at the head of the flight all have to line up. Finding a problem with any of that on the shop floor costs an hour. Finding it on site, with galvanised and painted steel that cannot be cut and rewelded without wrecking the finish, costs a return visit and a reorder.

It is also why a balcony like this does not get welded together in somebody's garden. If the first time the parts meet each other is on site, the fit is a hope rather than a fact.

A handrail as well as the glass

A frameless glass run on a flat terrace does not need anything to hold. A staircase does. Approved Document K expects a graspable handrail on a flight, and the bare top edge of a glass panel is not one.

The answer here is a Ø42 slotted stainless steel handrail that sits over the top edge of the stair glass. It gives you something to hold without introducing posts, brackets or a second system, so the frameless look survives the one place where a handrail is not optional. If you are specifying a glass balustrade to a staircase and nobody has mentioned a handrail, raise it early, because adding one afterwards means working on a finished run.

Two different glass specifications in one run

The landing glass and the stair glass are not the same. The balcony is 17.5mm toughened and laminated clear. The flight is 15mm toughened clear, capped by the handrail.

That is the sort of thing that gets settled on a drawing and cannot be sorted out on site, because the panels are ordered to size and specification weeks before anyone turns up. It is a good question to ask of any quote that covers both a balcony and a staircase: which glass is going where, and why.

Obscured glass on one side, clear on the other

The balcony looks over a garden on one side and straight at a neighbouring garden on the other. Clear glass everywhere would have been the wrong answer for half of it.

The panels on the neighbouring side are obscured rather than clear, and they sit in the same base channel at the same height as everything else. From the deck it reads as one balustrade that happens to change from clear to opaque at the corner, not as a balustrade with a privacy screen added to the end of it.

Obscured glass privacy panels set in the same base channel as the clear frameless glass, walkout balcony in Sheffield
Obscured panels toward the neighbour, clear glass toward the view, one continuous channel

This is the cheaper and tidier way to get privacy on a balcony. A separate screen is a second system with its own posts, its own fixings and its own appearance. Changing the glass in a run you are already building costs very little extra. Where you want screening taller than the guarding, that is a different job, and our 1.8m glass windbreak and privacy screens are the product for it.

The balcony itself

The deck is carried on steel posts down to ground level, which is what suits a solid brick elevation with a usable space underneath. Nothing hangs off the wall, so the wall is not doing structural work it was never built for, and the area below the balcony stays open and sheltered.

The joists are 100 x 50 x 6 steel angle at 370mm centres, with a doubled joist under the board joint. That is closer than a timber deck would normally be framed, and it is the reason a composite board that spans well still feels solid underfoot after a few years.

Post-supported walkout balcony with an external steel staircase and frameless glass balustrade, Sheffield
The balcony on posts, with the stair glass running unbroken into the balcony glass
Open riser external steel staircase with Durbar treads down from a walkout balcony, Sheffield
Open risers keep the flight light under the balcony rather than walling the space in
Grooved composite decking and frameless glass balustrade on a walkout balcony in Sheffield
Composite boards, and nothing in the way of the view across the rooftops

Worth knowing before you ask for this

Carrying base channel down a staircase is not a standard option you tick. It needs the stair and the balustrade designed together by one company, because the angle, the channel, the glass sizes and the stringer all have to be set out on the same drawing. If the staircase is already made, or it is coming from a different supplier, the honest answer is usually a posted system on the flight instead.

It also costs more than a bar infill on the stairs. What you get for it is a single uninterrupted run of glass and no visual join between the balcony and the flight, which is the whole reason people choose frameless in the first place. Our glass balustrade fixing guide sets out how base channel compares with the other fixing methods.

Get a price for something similar

Send photographs of the elevation and the ground below it, the length of the balcony and the height from the door down to ground level, to sales@diomet.co.uk, or call 0114 243 9009. If you want the glass to run down the stairs, say so at enquiry stage rather than later.

If you are not sure which of those fits, our how to get a price page sets out exactly what we need from you.

Before you order

Frequently asked questions

Can a frameless glass balustrade run down a staircase?

Yes, but not by fixing a base channel to the top of a stringer. An 80 x 80 steel angle is added to the outside of the stringer first, and the channel sits on that. It has to be drawn that way from the start, because the angle position sets the glass line and every panel size on the flight.

Why do most staircases have a posted balustrade instead?

Because a stringer gives you a narrow, raked edge rather than a flat surface, so a base channel has nothing continuous to sit on unless something is added to carry it. A posted or bar system is simpler and cheaper, which is why it is the usual answer when the stair and the balustrade come from different suppliers.

Do you really build it in the workshop first?

Yes. The balcony frame and the staircase were assembled complete in our Sheffield workshop in raw steel, then taken apart, galvanised, powdercoated and bolted back together on site. On a job where a raked balustrade has to meet a horizontal one, that trial build is what turns a drawing into a known quantity before the finish goes on.

Do I still need a handrail if the staircase has glass balustrades?

You should expect to. Approved Document K looks for something graspable on a flight, and the bare top edge of a glass panel is not that. Here a Ø42 slotted stainless steel handrail sits over the top edge of the stair glass, which gives you a handrail without adding posts. Your building control officer confirms what your own staircase needs.

Can I have obscured glass for privacy in the same balustrade?

Yes. The panels facing the neighbour here are obscured and sit in the same channel at the same height as the clear ones. Changing the glass in a run you are already building is much cheaper than adding a separate privacy screen afterwards.

Does the balcony need to be fixed to the house?

Not necessarily. This one is carried on four posts down to pad foundations, which takes the load off the wall and keeps the space underneath open and sheltered. Which arrangement suits your elevation is a survey decision.

What happens if there is a downpipe or a porch in the way?

It gets designed around. On this job the porch stayed and the rainwater downpipe stayed, and the frame was set out to clear both. Existing pipework is a survey question, not a reason the balcony cannot be built.

Do you work outside Sheffield?

Yes. We design, manufacture and install balconies, staircases and balustrades across the UK, supply only or fully installed. This one was made and fitted by us locally.