This one is not our usual work and we are not pretending otherwise. Most of what leaves our workshop is architectural, which means somebody is going to look at it. This went in to hold a roof up and then disappear behind plasterboard.
A builder we work with locally was putting a large extension on a house in the Rotherham area and needed the roof steelwork designed, made and installed. We did all three, and his gang worked alongside ours on the install.
What we made
- Steel roof frame for a house extension, to the structural engineer's sizes
- Connections, base plates, splices and stiffeners detailed by us
- Multiple steel tangs welded on for fixing the roofing timbers
- Primer painted only
- Designed, manufactured and installed, with the builder providing labour to assist
This one was bespoke
Structural steelwork is priced from your engineer's drawings rather than off a page. Send them over and we will detail it, make it and put it in.
The tangs are the point
Look along the top of the beams in that photograph and you will see a row of small steel plates standing up at regular centres. Those are the tangs, and they are why this job is worth writing about.
Steel and timber do not naturally want to be joined. Normally the carpenter arrives, finds a bare steel beam, and has to work out how to get rafters onto it. That means drilling steel at height, or straps, or a timber wall plate bolted along the top, all done on a scaffold in whatever weather is going.
Tangs move that work into the workshop. The plates are welded on before the steel is painted, set out at the centres the timbers are going to land on, and once the frame is standing the carpenter has something to fix to straight away. No drilling steel on site, no guessing at centres, and nothing to put right afterwards.
It costs very little to add at the fabrication stage and it saves a day or two on site. Builders who have had it once tend to ask for it every time.
Taking an engineer's sizes and making them work
Worth being precise about what we did here, because the word design covers two different jobs.
The structural engineer sized the steel. Spans, sections, loadings and the calculations behind them are an engineer's responsibility and they stay that way. That is our position on any job with structure in it.
What we did was take those sizes and make them buildable. Where the connections go and how they are made. How the base plates sit on what is actually underneath them. Where a splice falls so a piece will get through the gate and up onto the floor. How it all gets set out so the frame lands on a building that is never quite the dimensions on the drawing. And in this case, where every tang goes.
A set of calculations tells you what size the steel needs to be. It does not tell you how to get it into a half built house down a residential street. That second half is the bit we do.
Primer only, and why that is right here
The steel went out in primer and nothing else. No galvanising, no powder coat.
That is the correct answer for internal structure. Once the roof is on and the ceiling is up, this frame is in a dry, enclosed space for the rest of its life. Galvanising it would be money spent on a corrosion risk that does not exist.
Where we do insist on galvanising is anything that lives outside, which is most of what we make. Our material finishes page sets out where each one belongs. The short version is that the finish follows the environment, not the budget.
Working with the builder's gang
The builder put labour to us on the install rather than standing back and watching. That suits everybody on a job like this. He knew the site, his men were already there, and we were not paying travel for a bigger crew than we needed.
It only works if it is agreed properly beforehand, which it was. Who is lifting, who is bolting, whose insurance covers what, and who makes the call if something does not line up. Sorted at order stage rather than on the morning.
Got steelwork on a drawing?
Send the engineer's drawings to sales@diomet.co.uk or use our contact page, and tell us whether you want it installed or delivered for your own gang. We have been fabricating from our Sheffield workshop for 35+ years, with UKCA EN 1090-2 factory production control, coded welders and documented QC. Architectural metalwork and structural glass is the bulk of it, and structural steelwork for builders we work with is part of the mix. Our how to get a price page sets out what to send.
If you also need the architectural metalwork on the same job, these are priced on the site:
- Galvanised Steel Access Staircase
- Bespoke Metal Railings and Guarding
- Walk-On Glass Floor with Steel Frame
- Heavy Duty Bespoke Metal Pergola
Frequently asked questions
Do you need an engineer's drawings before you can quote?
For anything structural, yes. We need the sizes and the loadings from an engineer. We will then detail it, make it and put it in.
Can you do the structural calculations?
No. We work with an external structural engineer and the calculations stay with an engineer. We are fabricators, and the honest answer is that the two jobs are separate for good reason.
Can I have tangs on my steels?
Yes, and it is worth asking for. We need to know the timber sizes and the centres they are going at before the steel is painted.
Will you install, or can my builder?
Either. We installed this one with the builder's labour assisting. Plenty goes out for the customer's own team to erect.
Is this what you normally do?
No. Most of our work is architectural metalwork and structural glass. We take structural jobs like this on where the customer is one we already work with and the job suits the workshop.